Fireplace Maintenance

11/22/2017 – ARC Chimney Services inspected and repaired the chimney. Work was proposed Labor Day by Brandon Maxwell at 888-998-2258. The work was done by Michael Murphy (850-602-0129 and Chase. Michael referred us to Jamie Gonzales (850-450-8856) with Dream Built Solutions to place tile.  

Continue Reading

Thanksgiving 2017

This was a good trip getting a lot done without killing ourselves. The new siding was completed and the fireplace serviced as well as the heater. Someone had stolen Fergies battery and the cable from both tractors. Went to Becky’s for Thanksgiving meal with family. Tuesday, 11/21/2017 – Arrived mid-afternoon. Walked new fence and let […]

Continue Reading

New Roof July 2017

Apex Roofing and Restoration, 993 Yeager Parkway, 251-660-4555, Kelly and BeverlyKeith Horness – cell 920-287-2836, apexroofs.mobile.keith@gmail.comAdam Stewart, QC, 256-962-2028Installers: Sergio, his daughter Jennifer and his younger brother. Shingle are GAF’s Timberline HD, Weatherwood stylePeak “Ice & Rain II Underlayment” Click here to see all photos in DropBox folder. Shingles were to be delivered Monday, 7/3 but supplier […]

Continue Reading

July 4, 2017 Work Week

Saturday, July 1 – JD cranked and we mowed the front and west yard. The capacitor on the AC compressor went out and Shane with ESTES replaced it. Charged tractor batteries. Sunday Mary finished cutting the grass and I trimmed the back of the ditch that Ted had sprayed. Trimmed around pecans and various places. Charged Fergie’s battery, […]

Continue Reading

Memorial Day 2017

This long holiday weekend began on an almost cool Wednesday afternoon, May 24, 2017. Thursday and Friday was also cool but warming up. By Friday afternoon: Mary weeded the front beds while Tom installed the new mower deck belt and ignition switch on the JD Lawn Tractor, greased the blade arbor shafts and adjusted the mower […]

Continue Reading

2016 Christmas Week

Driskells have planted grass in the cotton stubble and the field is green. Mobile Gas has buried the exposed yellow gas line at the driveway into the pond field. Orange locate paint and flags locating the ATT buried cable were still in place along the fence about 12-18″ toward to pavement. Roses are blooming still […]

Continue Reading

Thanksgiving 2016

Very white field of cotton, a new well and cutting down all the Chinese tallow in the little pond are the high lites of this holiday. Wednesday, 11/23/16 – Moved the lumber from the grain bin to pole barn and added what we hauled in. Rearranged the grain bin and added two 4×8 sheets of […]

Continue Reading

The New Water Well

Dad’s shallow well pump finally quit and we have also had trouble with it loosing prime due to decay in the well tip and screen. Rather than replace it, and still have only the low capacity shallow well, we hired Edwin Williams/Bay Water Well to install a 4″ casing with a submersible 25 GPM pump. […]

Continue Reading