Built Bed Next to the Front Walk
3/16/2024 – Completed a new bed along the front walkway from the east end of the driveway bed to the Daylilies at the SW corner of the house. This is where the Magnolia Frescati had been and part of its stump is now under the mulch. Tilled the sod and added about 4-6 inches of […]
Continue Reading