2/22/2019 – Completed the installation of 1/2″ drip irrigation in the beds along:
- the wood fence next to the pecan orchard north to the second Camilla; i.e not into the Bay Tree bed;
- to the gate post at the driveway and;
- installed a 2-hour mechanical timer at the new fawcett at the power pole in the SE corner.