Completed irrigation in most of the front yard’s beds

Yard

2/22/2019 – Completed the installation of 1/2″ drip irrigation in the beds along:

  • the wood fence next to the pecan orchard north to the second Camilla; i.e not into the Bay Tree bed;
  • to the gate post at the driveway and;
  • installed a 2-hour mechanical timer at the new fawcett at the power pole in the SE corner.